Client: Deleg8
Location: Minchinbury
Value: $150,000
Description of Works
North Shore Paving was contracted by Deleg8 to construct a new road within the Pinegrove Memorial Park. The scope of works for the new 180m road included; full depth pavement with a subbase and base course layer, concrete kerbs, 7mm primer seal, asphalt wearing course, subsoil drainage and line marking.
Key Features
- Concrete kerbs and dish drain construction
- 7mm primer seal
- Full depth asphalt pavement construction
- Asphalt wearing course
- Line marking
- Subsoil drainage installed