Description of Works
The Lower Campus Development, Stage 1 involved the demolition and removal of two buildings, the relocation of existing services, installation of new services, the construction of new stormwater drains and the construction of a new road and footpath. Incorporated within the new road is street lighting and kerb inlet pits for the stormwater.North Shore Paving was able to expertly manage this complex infrastructure project and the relocation of the existing services allowed for the construction of a future buildings in the area.
Key Features
- Asphaltic concrete road pavement
- Concrete kerb and gutter
- Concrete footpaths, with segmental pavers
- Extensive service relocation, upgrade and new construction including
- Gas services
- Piped stormwater drainage system
- Potable cold water
- Treated and untreated bore water
- Grey water system
- Sewer pump out system
- Hydraulic and fire services
- High and low voltage services
- Light poles and luminaries
More Projects
- Western Sydney Stadium Civil Pavement Works
- Lake Parramatta Car Park
- NSBHS Sports Courts
- Sydney Academy of Sport Road Reconstruction
- P7 Car Park – Sydney Olympic Park
- Waterfall Commuter Car Park
- Sydney International Regatta Centre
- Prospect Drying Beds
- Sydney Olympic Park Substation Landscape Works
- Camden General Cemetery Upgrade - Stage 1
- More Projects